Craftsman’s National Estimator Cloud includes 10 costbooks which are updated quarterly. Here’s a partial summary of recent costbook-specific updates.

CONSTRUCTION, JULY 2022 — sections (and pages) updated:

  • OSB  (203)
  • Plywood (202-204, 460)
  • Carpentry (32-37, 39-51, 56-57, 61-62, 67, 98-100, 283, 331, 389-397, 403, 476, 591, 593)
  • Concrete Formwork (87-89, 93, 338-346, 352-353, 360, 363-369, 377-378)
  • Framing Lumber, Boards (194-198, 204)
  • Timbers (201, 605, 608, 616)
  • Board Siding (199-201)
  • Pressure Treated Lumber (201-202)
  • Concrete Fireproofing (408-409)

 

ELECTRICAL, JULY 2022 — sections (and pages) updated:

  • Transformers (332-334, 370)
  • Aluminum Wiring (105-114)
  • Copper Wiring (93-104)

 

IMPROVEMENT, JULY 2022 — sections (and pages) updated:

  • Concrete Formwork (40, 43-44, 49)
  • Rough Carpentry (62-77)

 

INSURANCE, JULY 2022 — sections (and pages) updated:

  • Rough Carpentry (353-382)
  • Pressure Treated Lumber (353-382)
  • Redwood (353-382)
  • Beams (353-382)
  • Glu-Lam (353-382)
  • Trusses (353-382)
  • Plywood (353-382)
  • OSB (353-382)
  • Pressure Treated Plywood (353-382)
  • Boards (353-382)

 

PLUMBING, JULY 2022 — sections (and pages) updated:

  • PVC Pressure Pipe (91-92, 101-102, 183, 315)
  • Plastic PVC/ABS Pipe (150, 154, 159, 164)
  • PVC Fittings (92-315)

 

REPAIR, JULY 2022 — sections (and pages) updated:

  • Rough Carpentry/Framing (182-229)
  • Pressure Treated Lumber (182-229)
  • Redwood (182-229)
  • Beams (182-229)
  • Glu-Lam (182-229)
  • Trusses (182-229)
  • Plywood (182-229)
  • OSB (182-229)
  • Pressure Treated Plywood (182-229)
  • Boards (182-229)

 

PAINTING, JULY 2022 — sections (and pages) updated:

  • Oil-Based Materials (entire book)