Craftsman’s National Estimator Cloud includes 10 costbooks which are updated quarterly. Here’s a partial summary of recent costbook-specific updates.
CONSTRUCTION, JULY 2022 — sections (and pages) updated:
- OSB (203)
- Plywood (202-204, 460)
- Carpentry (32-37, 39-51, 56-57, 61-62, 67, 98-100, 283, 331, 389-397, 403, 476, 591, 593)
- Concrete Formwork (87-89, 93, 338-346, 352-353, 360, 363-369, 377-378)
- Framing Lumber, Boards (194-198, 204)
- Timbers (201, 605, 608, 616)
- Board Siding (199-201)
- Pressure Treated Lumber (201-202)
- Concrete Fireproofing (408-409)
ELECTRICAL, JULY 2022 — sections (and pages) updated:
- Transformers (332-334, 370)
- Aluminum Wiring (105-114)
- Copper Wiring (93-104)
IMPROVEMENT, JULY 2022 — sections (and pages) updated:
- Concrete Formwork (40, 43-44, 49)
- Rough Carpentry (62-77)
INSURANCE, JULY 2022 — sections (and pages) updated:
- Rough Carpentry (353-382)
- Pressure Treated Lumber (353-382)
- Redwood (353-382)
- Beams (353-382)
- Glu-Lam (353-382)
- Trusses (353-382)
- Plywood (353-382)
- OSB (353-382)
- Pressure Treated Plywood (353-382)
- Boards (353-382)
PLUMBING, JULY 2022 — sections (and pages) updated:
- PVC Pressure Pipe (91-92, 101-102, 183, 315)
- Plastic PVC/ABS Pipe (150, 154, 159, 164)
- PVC Fittings (92-315)
REPAIR, JULY 2022 — sections (and pages) updated:
- Rough Carpentry/Framing (182-229)
- Pressure Treated Lumber (182-229)
- Redwood (182-229)
- Beams (182-229)
- Glu-Lam (182-229)
- Trusses (182-229)
- Plywood (182-229)
- OSB (182-229)
- Pressure Treated Plywood (182-229)
- Boards (182-229)
PAINTING, JULY 2022 — sections (and pages) updated:
- Oil-Based Materials (entire book)